9. Start Up and Operation
9.1
Overview
Once all electrical connections have been made, your MPC is ready for
Start-up. The following sections detail the procedures required to
complete the MPC start up.
WARNING: DO NOT attempt to remove the cover of the MPC and
set up the MPC in a very wet or rainy environment. While care has
been taken to insulate power connections, DANGEROUS voltages
are present and can cause electric shock, and possible
electrocution if safety procedures are not followed
W
HEN POWER IS SUPPLIED TO THE UNIT
,
LINE VOLTAGE IS PRESENT WITHIN
THE
MPC
ENCLOSURE
EVEN WHEN THE
M
OTOR IS
OFF.
D
URING
S
TART
-
UP
,
IT IS NECESSARY TO RUN THE PUMP MOTOR
.
T
HIS WILL
CAUSE FLUID TO DISCHARGE FROM THE PUMP
.
Y
OU ARE RESPONSIBLE FOR
SAFELY DIVERTING FLOW FROM THE PUMP DURING START
-
UP AND
CALIBRATION
.
T
HE
MPC
IS DESIGNED TO RUN THE PUMP CONTINUOUSLY WITHIN ITS RATED
PRESSURE AND FLOW
.
O
PERATION BEYOND RATED SPECIFICATIONS
,
EVEN
INTERMITTENTLY
,
MAY DAMAGE EQUIPMENT AND VOID THE WARRANTY
.
I
F THIS EQUIPMENT IS USED IN ANY MANNER NOT SPECIFIED BY
P
ULSAFEEDER
,
PROTECTION PROVIDED BY THE EQUIPMENT MAY BE IMPAIRED
.