beautypg.com

Pump suitability to site of installation, Uitability to, Ite of – Pulsafeeder MPC User Manual

Page 10: Nstallation

background image

Pulsafeeder, Inc. is considered released from any liability in the following

cases:

- improper installation;

- improper use of the equipment by non-professional or

inadequately trained operators;

- use not in compliance with regulations in the Country of use;

- lack of maintenance or improperly performed;

- use of non-original spare parts or incorrect parts for the model in

question;

-

total or partial failure to observe the instructions;

- exceptional environmental events.

DO NOT PERFORM ANY WORK ON THE PUMP, MOTOR OR MPC
CONTROL UNIT WITH ELECTRICAL POWER CONNECTED TO THE
MPC CONTROL UNIT. DO NOT OPERATE MPC UNIT WITH THE
COVER REMOVED. DANGER OF ELECTRONIC SHOCK AND
MECHANICAL PINCH HAZARD!

INSTALLATION AND REPAIRS SHOULD ONLY BE PERFORMED BY
AUTHORIZED PERSONNEL!

FOLLOW ALL SAFETY/ LOCAL LOCK-OUT, TAG-OUT
PROCEEDURES!



5. Pump Suitability to Site of Installation


Upon equipment receipt, verify that pumps have not received any damage due to
transportation and are complete with every eventual accessory. In case anomalies or
damages are discovered prior to installation, please contact PULSAFEEDER, INC.
Technical Service.