Installation, Stacking – Blodgett CNVX-14E User Manual
Page 12
8
Installation
Stacking
WaRNING!!
Stacking should be performed by qualified
installation personnel only. The ovens are
heavy. Take care to use proper tools and tech-
niques when lifting and stacking units.
1. Attach the legs or casters to the bottom oven.
2. Place the top oven on the bottom oven. Be sure all
four sides are flush.
3. Remove left side oven panels.
4. Bolt the two ovens together from underneath into the
two threaded nut retainers.
5.
GaS aPPLIaNCES ONLY: Attach the flue vents and
gas manifold as shown.
Figure 4
Left Side of Ovens
with Side Panels
Removed
Threaded Nut Retainer
Bolt
Hot Air Flue
Steam Generator
Flue (BCX-14 only)
Gas Manifold
Rear View BCX-14G