beautypg.com

Pecial, Ules on, Ollbacks – Allied Telesis AlliedView-UM 2.0 User Manual

Page 117: Erforming a, Ollback on a, Evice

background image



B. Special Rules on Rollbacks

If the last entry in the Audit Trail is a Reboot Device operation or an Execute Script File

operation, then AlliedView-UM will locate the most recent non-Reboot Device operation
entry in the Audit Trail. That entry will be the one to be rolled back.

#

AUDIT

1

Release Upgrade 1

2

Patch Upgrade 1

3

Configuration File Update 1

4

Patch Upgrade 2

5

Release Upgrade 2

6

Release Upgrade 3

7 Reboot

Device

8 Reboot

Device

In the example above, the most recent non-Reboot entry in the Audit Trail is “Release

Upgrade 3”. “Release Upgrade 3” will be the operation to be rolled back. If the last entry

on the Audit Trail is a Rollback operation, then a Rollback cannot be performed.

C. Performing a Rollback on a Device

1. Right click on a device definition in the Device Families Pane to display the device

context menu and select “Rollback Last Operation”.

AlliedView™-UM 2.0 USER’S GUIDE

Page 117 of 128