beautypg.com

17 schedule operation, Ow to, Chedule an – Allied Telesis AlliedView-UM 2.0 User Manual

Page 110: Peration

background image



17 Schedule Operation

Operations can be executed at a specified time using the Operation Scheduling function.

A. How to Schedule an Operation

To schedule an operation, you must first define an operation profile using the methods

discussed in the previous sections of this document.

Once you have created your profile, click on the

button. This will display

the Schedule Task dialog box.

On the Task Name field, enter a name for the operation to be scheduled. Enter the date
and time when the operation will be executed on the Time Schedule field. To set the time,
double click on an element (e.g. Double click on the “09” of the “09 Jun 2004…” on the

image above.) to highlight it. You may then use the spin control to change the value.

Finally, click on the OK button.

AlliedView™-UM 2.0 USER’S GUIDE

Page 110 of 128