beautypg.com

Step 5: connect power – HP Surestore 2.28 Tape Library User Manual

Page 36

background image

2-8

Library Installation

Step 5: Connect Power

Step 5: Connect Power

Use the power cord shipped with the library.

1. Make sure the power switch on the front of the library is switched off.

2. Plug the power cord into the power port on the back of the library.

3. Plug the other end of the power cord into a three-hole grounded outlet.

4. Turn on the power switch.

SELF TEST

and

NOT READY

alternately appear in the display window on

the library. Once the power on test completes (approximately 3 minutes),
the drive status information appears in the display window. (See
“Understanding the Display Window” on page 4-4.)

NOTE

If the drive status information does not display, the power on test was not
successful and

DEVICE FAILED

displays. For troubleshooting procedures,

see “Troubleshooting” on page 4-41.

5. Turn on power to the host.

This manual is related to the following products: