beautypg.com

Change the meter representation, Copying a scenario – HP Matrix Operating Environment Software User Manual

Page 68

background image

Ending (the simulation shall end at the selected date – default)

Beginning (the simulation shall begin at the selected date)

4.

Change the date, if needed, to work well with your other Data Range selections

5.

Click OK to refresh the scenario resource utilization table with data collected during the defined
interval.

6.

Click Cancel Edit Interval to return to the previous data range for this scenario.

Change the meter representation

Prerequisites:

You must be editing a scenario (see

“Editing a scenario” (page 66)

).

NOTE:

Changes to the Meters Represent: options are applied to the current scenario editing

session, but options return to the default values at the beginning of any new session.

Click the drop-down arrow to select a type of calculation to be represented in the meter bars
in the resource utilization table. The choices are as follow:

average

90th percentile

peak

(default)

max 15 minute sustained

The scenario resource utilization table displays the new values for each resource, including
violations of utilization limits set for each resource.

Copying a scenario

It is frequently desirable to use an existing scenario as the starting point for developing a new
scenario. Copying a scenario provides an easy way to accomplish this.

Prerequisites

You must be logged in to Matrix Operating Environment. (See

“Accessing Capacity Advisor”

(page 37)

.)

You must be authorized on all systems in the scenario (see HP Matrix Operating Environment
Getting Started Guide
).

Procedure 28 To Copy a Scenario

1.

If you are not on the Planning tab:

If the Planning tab is visible, click the Planning tab.

If the Planning tab is not visible, select Optimize

→Capacity Planning→View Planning

Scenarios... from the top menu bar.

The Planning tab opens with a list of existing scenarios that you are authorized to view.

2.

Click the check box preceding the scenario that you want to copy.

3.

Select Create

→Copy Planning Scenario....

The Copy Scenario screen displays.

4.

Modify the Name and Description fields as appropriate.

5.

Click OK.

You are returned to the Capacity Advisor tab, and the copied scenario appears in the scenario
list.

68

Procedures