beautypg.com

2 process data, Process data structure – NORD Drivesystems BU0570 User Manual

Page 18

background image

EtherCAT bus module for NORD frequency inverters SK 5xxE

18

Subject to technical amendments

BU 0570 GB-0312

4.2 Process data

Control words and setpoints are transferred from the bus master to the SK TU3-…bus module as process
data and in return, the status word and actual values are sent to the bus master / controller from the FI.
Transfer is carried out cyclically. The bus master / controller can access these process values directly, as
they are stored in the I/O area.
For EtherCAT the length and structure of the process data are fixed and are determined by the XML-File.
According to the SK TU3-ECT / FI combination, 4 or 6 process values are available.
The allocation of the values transferred in the setpoint/actual value area of the FI is made via the
parameters P543 to P548 or P543 [-01]…[-05].

4.2.1

Process data structure

The structure of the process data is defined by the XML file.

Direction of

transmission

Transmitted data

( 8 Byte )

1st

word

2nd word

3rd word

4th word

... to SK TU3

Control word

Setpoint 1

Setpoint 2

Setpoint 3

... from the SK TU3

Status word

Actual
value 1

Actual
value 2

Actual
value 3

Table 11: Process data structure SK 500E to SK 535E

Direction of

transmission

Transmitted data

( 12 Byte )

1st word

2nd word

3rd word

4th word

5th word

6th word

... to SK TU3

Control word

Setpoint 1

Setpoint 2

Setpoint 3

Setpoint 4

Setpoint 5

... from the SK TU3

Status word

Actual
value 1

Actual
value 2

Actual
value 3

Actual
value 4

Actual value 5

Table 12: Process data structure SK 540E to SK 545E