4 installation of zr40h automatic calibration unit, 1 location, 2 mounting of zr40h automatic calibration unit – Yokogawa Single Channel Oxygen Analyzer System ZR22/ZR402 User Manual
Page 56: Location -9, Mounting of zr40h automatic calibration unit -9
IM 11M12A01-03E
3-9
3. Installation
3.4
Installation of ZR40H Automatic Calibration Unit
3.4.1
Location
The following should be taken into consideration:
(1) Easy access to the unit for checking and maintenance work.
(2) Near to the detector and the converter
(3) No corrosive gas.
(4) An ambient temperature of not more than 55
ЊC and little change of temperature.
(5) No vibration.
(6) Little exposure to rays of the sun or rain.
3.4.2
Mounting of ZR40H Automatic Calibration Unit
The Automatic Calibration Unit can be mounted either on a pipe (nominal JIS 50A ) or
on a wall. It should be positioned vertically so that the flowmeter works correctly.
(1) Prepare a vertical pipe of sufficient strength (nominal JIS 50A: O.D. 60.5 mm) for
mounting of Automatic Calibration Unit. (The unit weights approximately 3.5 kg.)
(2) Mount the Automatic Calibration Unit on the pipe by tightening the nuts with the
U-bolt so that the metal fitting is firmly attached to the pipe.
F3.11E.EPS
Figure 3.11 Pipe Mounting