Yokogawa Single Channel Oxygen Analyzer System ZR22/ZR402 User Manual
Page 3
IM 1M12A01-03E
ii
This manual consists of twelve chapters. Please refer to the reference chapters for
installation, operation and maintenance.
Table of Contents
T.Int.2E
᭺
᭺
᭺
᭺
᭝
᭺
᭺
᭺
᭝
᭝
᭝
᭝
᭝
᭝
᭝
᭺
᭺
᭺
᭺
᭺
᭺
᭺
References
Chapter
Outline
Installation Operation Maintenance
1. Overview
Equipment models and system configuration examples
2. Specifications
Standard specification, model code (or part number),
dimension drawing for each equipment
3. Installation
Installation method for each equipment
4. Piping
Examples of piping in three standard system
configurations
5. Wiring
Wiring procedures such as Power supply wiring , output
signal wiring or others
6. Components
These are described in this manual
7. Startup
Basic procedure to start operation of EXAxt ZR. Chapter 7
enables you to operate the equipment immediately.
8. Detailed Data Setting
Details of key operations and displays
9. Calibration
Describes the calibration procedure required in the course
of operation.
10. Other Functions
Other functions described
11. Inspection and
How to conduct maintenance of EXAxt ZR and procedures
Maintenance
for replacement of deteriorated parts
12. Troubleshooting
This chapter describes measures to be taken when an
abnormal condition occurs.
CMPL (parts list)
User replaceable parts list
᭺
᭺
᭝
: Read and completely understand before operating the equipment.
: Read before operating the equipment, and refer to whenever necessary.
: Recommended to read it at least once.
᭺
᭝
᭝
᭝
᭺
᭺
᭺