Vanguard CT-8000 S3 User Manual
Page 107
REV 1 CT-8000 S3 USER’S MANUAL
102
b. The following screen will be displayed:
Press the
[1]
key (ANALYSIS POINTS).
c. The following screen will be displayed:
Press the
[4]
key (TEST PLANS).
d. The following screen will be displayed:
Press the
[1]
key (LOAD TEST PLAN).
e. The first test plan stored in the CT-8000 S3’s Flash EEPROM will be listed:
You can scroll through the list of test plans by pressing the
[]
and
[]
keys. Once you
have located the test plan that you would like to load, press the
[ENTER]
key. The test
plan will be loaded and you will be returned to the “START-UP” menu. The test plan will
be used for all subsequent timing tests. A typical test results printout with Pass/Fail
indicators is shown in Figure 36.
The following screen will be displayed if there are no test plans stored in the
CT-8000 S3’s Flash EEPROM:
TEST PLAN # 01
BZO-145-20-7
SIEMENS
DEMO TEST PLAN 1
1.
LOAD TEST PLAN
2.
PRINT TEST PLAN
3.
PRINT PLAN DIR
4.
ERASE TEST PLAN
5.
SAVE TEST PLAN
1.
OPEN TIMING
2.
CLOSE TIMING
3.
PRINT SETTINGS
4.
TEST PLANS
1.
ANALYSIS POINTS
2.
MEASUREMENT UNITS
3.
SHOT DESCRIPTION
4.
NUMBER OF CHANNELS
5.
NEXT PAGE