Alpha Technologies GMX-915 User Manual
Page 26

26
017-932-B0-002, Rev. B
3.0
Installation, continued
3.3
Service Power Inserter (SPI), continued
6. Replace the SPI cover and reinstall the screws.
7. Verify the switch on the top of the SPI is in the
ON position. The switch in the ON position
selects the GMX Power Supply as the power
source to the cable plant. The switch should
only be in the ALT position when a service
power supply is connected to the cable. At this
time, the standby power supply is bypassed for
service or removal
.
8. Verify the SPI is properly grounded. Typically,
grounding is accomplished by one of two
methods:
a. If the SPI has been installed with a mounting bracket, ground connection is made
with paint-cutting star washers (Fig. 3-6) used in conjunction with SPI grounding wire.
b. If the SPI doesn’t utilize the mounting bracket, the ground connection is made via
a #8AWG wire connected to the cover of the SPI (Fig. 3-7) and terminated at the
ground bar of the cabinet (Fig. 3-8).
Fig. 3-7, SPI Grounding Lug
Fig. 3-8, Enclosure Ground Bar
Fig. 3-6, Cover Replaced,
SPI Switched On
Enclosure
Wall
Paint-cutting
Star Washers
ALT ON
6
6
7
- AlphaCell GelCell Series (32 pages)
- FXM 650, 1100, 2000 UPS (96 pages)
- Cordex 48-1.2kW (68 pages)
- Radium MiniBay (57 pages)
- Fiber Backhaul Enclosure (FBE) (19 pages)
- FBE2322 Enclosure System (38 pages)
- FlexNet PMR, GMR Series (49 pages)
- Te25xh (38 pages)
- FlexNet MPS48-12M - Technical Manual (33 pages)
- FlexNet MPS48-12M - Quick Start Guide (2 pages)
- FlexNet ELPM 300-48D (25 pages)
- FlexNet FMPS (40 pages)
- FlexPoint AX Series (34 pages)
- FlexPoint FPR1207-F - Technical Manual (18 pages)
- FlexPoint FPR1207-F - Quick Start Guide (2 pages)
- AlphaGen PN-6x-T 7.5kW 48VDC - Installation and Operation Manual (79 pages)
- AlphaGen CE-3x2 5K-T 48Vdc (95 pages)
- AlphaGen PN-6x-T 7.5kW 48Vdc (95 pages)
- AlphaGen 3.5_5.0kW Kohler COM5 (80 pages)
- Security Bar Field For UPE-3, UPE-6, UPE-M3, UPE-M6, PN Series and CE Series (2 pages)
- AMPS80 HP (116 pages)
- 255A Bypass Switch (24 pages)
- AMP24 HP (108 pages)
- FXM350_Micro350 UPS (112 pages)
- CFR 600, CFR 600XT, CFR 1000 (70 pages)
- BPS Series Bypass Switch (36 pages)
- CFR Intelligent Interface Device (54 pages)
- CFR Redundant Control Unit (23 pages)
- CFR 5000, CFR 5000RM (88 pages)
- CFR 3000, CFR 3000RM (86 pages)
- CFR 1500, CFR 1500RM (83 pages)
- CFR 1500, CFR 2000, CFR 2500, CFR 3000 (76 pages)
- Continuity: 1000_2000_3000 (48 pages)
- Continuity Battery Pack (20 pages)
- Continuity: 6K_10K (52 pages)
- Micro, Micro XL, Micro XL3 UPS (99 pages)
- Micro Secure UPS (80 pages)
- Te17 (32 pages)
- Te45 (68 pages)
- Te41, 48V (76 pages)
- Te41, 24V (72 pages)
- Te43 (60 pages)
- AlphaGuard AG-CMT Installation (2 pages)
- AlphaGuard AG-CMT-3SC_4SC-P (2 pages)
- Digital Midtron DM-3200 AT (2 pages)