Starting a tank or line leak test: 1, Testing note: 1, Showing the status of tank or line leak tests 1 – Franklin Fueling Systems Tank Sentinel (TS-1001, 2001, 504, 508 & 750) Operators Guide Rev. C User Manual
Page 21: Indications of active tests: 1, Test, Starting a tank or line leak test
Console – Basic Operation
Page
1 - 11
1
Special Keys ( Continued... )
The
TEST
key is used to: check
the Status of running tank or line
leak tests, or to Start or Abort a
test.
Starting a tank or Line
Leak Test:
Follow the steps to the left &
follow test requirements in
Chapter 4.
Once a Tank or Line is chosen, it
is removed from the start-test
display.
Testing Note:
A tank leak test, time-estimate
report can be printed by pressing
the
REPORT
key –
M4
key –
under
TEST
and then
M1
under
ESTIMATE
.
Showing the Status of
Tank or Line Leak Tests
Indications of Active
Tests:
• The word TESTING is slowly
flashed under the TANK or LINE
when one or more tests are
running. See the normal status-
display
➀
text that is shown on
page 1 - 3 of this Chapter.
• The INCON TS-LLD Line Leak
Test light will also be on at the
TS-LLD Control Unit when a Line
Leak Test is running.
L
Y
TEST
0
1) Press the
TEST
key and then the
M2
key (above)
2) Choose the type of test below (press a
menu key
)
3) Choose the Tank or Line # (press a
menu key
)
4) Choose ALL – press
DOWN
and then the
M1
key
Press the
TEST
key, the
M1
key, and then the
UP
or
DOWN
key to show the Status of other Leak
Tests.
NOTE
Because
SCALD® is a
S tatistical
C ontinuous
A utomatic
L eak
D etection
program
that runs
Tank-Leak-
Tests
continuously,
SCALD leak
tests are
not
included
with
standard
Active Leak
Tests.
– or –
SELECT LEAK TEST OPTION
STATUS
START
ABORT
M1
M2
M3
M4
LEFT
RIGHT
SELECT LEAK TEST TO START
0.1 TANK
0.2 TANK
M1
M2
M3
M4
LEFT
RIGHT
SELECT TANK TO START 0.2 TEST (MORE)
TANK 1
TANK 2
TANK 3
TANK 4
M1
M2
M3
M4
LEFT
RIGHT
SELECT TANK TO START 0.2 TEST (MORE)
ALL TANKS (or ALL LINES for Line Leak Tests)
M1
M2
M3
M4
LEFT
RIGHT
ACTIVE LEAK TESTS
(UP/DN)
TANK 1
0.2 GPH
STARTED
08:53:54PM
M1
M2
M3
M4
LEFT
RIGHT
ACTIVE LEAK TESTS
(UP/DN)
TANK 3
0.2 GPH
STARTED
09:12:04PM
M1
M2
M3
M4
LEFT
RIGHT
NO ACTIVE LEAK TESTS (are running)
M1
M2
M3
M4
LEFT
RIGHT