beautypg.com

3 installation, 1 scope of delivery, 2 requirements of the measurement location – YSI IQ S ENSOR N ET DIQ/S 182 XT User Manual

Page 21: 3 installation guidelines for lightning protection, Installation -1, Scope of delivery -1, Requirements of the measurement location -1, 3installation

background image

System 182

Installation

3 - 1

ba76022e01

12/2011

3

Installation

3.1

Scope of delivery

The following parts are included in the scope of delivery of the
DIQ/S 182:

 DIQ/S 182 Universal Transmitter

 Accessory kit with:

– Contact carrier with screws

– ISO cap nuts with screws and ring washers

– Cable glands with sealing gaskets

 Operating manual.

3.2

Requirements of the measurement location

The measurement location must meet the environmental conditions
specified in section 9.1 IQ S

ENSOR

N

ET

.

3.3

Installation guidelines for lightning protection

When using the IQ S

ENSOR

N

ET

instrumentation, particularly in outdoor

areas, adequate protection against (electrical) surges must be
provided. A surge is a summation phenomenon of surge voltage and
surge current. It is generated through the indirect effect of a lightning
event or switching operation in the mains, in the grounding system and
in information technology lines.

To be adequately protected against the damaging effects of surges, an
integrated concept of the following protective measures is required:

 internal device-related protective measures and

 external protective measures of the installation environment.

The internal device-related protective measures are already integrated
in the YSI online measuring technology as so-called 'lightning
protection' (see chapter 9 T

ECHNICAL

DATA

).

The external protective measures of the installation environment can
be carried out with respect to the following guidelines:

1 All lines of the IQ S

ENSOR

N

ET

system must be

a) installed inside (or else close to) the grounded metallic mounting
constructions, e.g. handrails, pipes and posts if possible