3 how to install, 1 how to install option in frequency converter – GE Industrial Solutions AF-650 GP PROFINET User Manual
Page 7

3 How to Install
3.1.1 How to Install Option in Frequency
Converter
Items required for installing a network option in the
frequency converter:
-
The network option
-
Network option adaptor frame for the AF-600 FP/
AF-650 GP. This frame is deeper than the
standard frame, to allow space for the network
option beneath
-
Strain relief (only for unit sizes 11 and 12)
Illustration 3.1
Illustration 3.2
Instructions:
-
Remove keypad panel from the AF-600 FP/AF-650
GP.
-
Remove the frame located beneath and discard it.
-
Push the option into place. The Ethernet
connectors must be facing upwards.
-
Remove both knock-outs on the network option
adaptor frame.
-
Push the network option adaptor frame for the
AF-600 FP/AF-650 GP into place.
-
Replace the keypad and attach cable
NOTE
Do not strip the Ethernet cable and ground it via the strain
relief-plate! The grounding of screened Ethernet cable is
done through the RJ-45 connector on the option.
NOTE
After installing the OPCPRT option, be aware of the
following parameter settings:
O-01 Control Site: [2] Controlword only or [0] Digital and ctrl.
word
O-02 Control Word Source: [3] Option A
How to Install
PROFINET Operating Instruction
6
3
3