Technical data – M&C TechGroup BA-C Operator's manual User Manual
Page 8

8
Gas sampling and gas conditioning technology
10-1.1.1-ME
Gas conditioning section:
The second cleaning stage are two mol sieve columns removing CO
2
and moisture (Fl2 and FI3)
being switched and purged resp. regenerated cyclical.
The inlet pressure is 70 - 145 psig. The manometer P1 on the front plate of the BA-C enables the
optical control of the inlet pressure.
The cleaned air is available at the outlet 2
. Here a connector G ¼“ i provided by customer can be
mounted.
If the inlet pressure drops to a value below 73 psi or the catalyst temperature falls below 914°F the
gas flow is switched off.
8
TECHNICAL DATA
Combustion Air Conditioning Unit
Type BA-C 230V
Type BA-C 115V
Part No.:
60 A 2000
60 A 2200
Inlet pressure
Instr. air 73 psi up to 145 psi
Flow rate air
maximum 15 Nl/min
Ambient temperature
+41°C to +104°F
Ready for operation
approx. 15 min.
Catalyst
Platinum/Paladium on Al
2
O
3
-Support
Temperature of catalyst
932°F
Contamination of catalyst
Halogene, silicon, lead, phosphoric substances
Adsorber
Molecular sieve
Purity of air
< 2 ppm CO
2
Storage temperature
-13°C to +149°C
Relative humidity
< 75 % avoid condensation
Gas connection „Inlet‟
G1/4“i
Gas connection „Outlet‟
G1/4“i
Power supply / Power consumption
230V 48-62 Hz 560VA
115V 48-62 Hz 150VA
Electrical connection
Mains cable 3x 1,5² 3 m length with cable end contact
Status cable 2x 0,75² 3m length with cable end contact
Electrical protection
1 x 4A
T
Status contact output
for pressure and temperature
1 NO contact - potential free, max . 24V, 1A
Protection
IP 20
(EN 60529)
Dimensions
19" housing 6 U (HE), depth 375 mm
Weight
24,5 kg
Colour of front plate
Ral 7035
Noise
Approx. 70db(A) cyclic 5min
Electrical equipment standard
EN 60204-1, EN 57721