beautypg.com

Receipt and storage, Installation notes – M&C TechGroup BA-C Operator's manual User Manual

Page 10

background image

10

Gas sampling and gas conditioning technology

10-1.1.1-ME

10

RECEIPT AND STORAGE

The BA-C combustion air conditioning unit is a complete, pre-installed unit. The standard catalyst
and adsorber cartridge supplied is already fitted. The filter to be connected upstream is attatched to
the device.

Immediately remove the air conditioning unit and any special accessories carefully from the

packaging and check the contents against the delivery note.

Inspect the unit for possible transport damage and inform the transport insurer concerned

immediately if any damage is noticed.

N O T E !

The air conditioning unit should be stored protected from frost!



11

INSTALLATION NOTES

N O T E !

The air conditioning unit must only be used in the conditions specified in
the technical data.

The air conditioning unit should be installed away from heat sources and
freely ventilated to prevent any accumulation of heat.

For outdoor installation, the air conditioning unit must be installed in a
housing protected from frost in the winter and sufficiently ventilated in
summer. Exposure to direct sunlight must be avoided.
At the inlet of the device (upstream the filter) a shut off valve shall be
provided