beautypg.com

Initial operation, Switch off, Maintenance – M&C TechGroup BA-C Operator's manual User Manual

Page 13

background image

13

Gas sampling and gas conditioning technology

10-1.1.1-ME

13

INITIAL OPERATION

Prior to initial operation, the system and process-specific safety measures must be observed !

The following steps must be carried out prior to initial operation:

Prior to initial operation, compare the system voltage with the voltage shown on the rating plate;

Connect the air conditioning unit to the mains;

Connect status contact ouput, if necessary ;

Operate the

“Power/On” switch (green LED lights).

Check the nominal temperature of 500°C at the temperature controller (see Figure 2).

When operational readiness has been reached (about 15 minutes), the 1 lights upin the display.

W A R N I N G !


The air conditioning unit is operated with min. 73 psi and max.
145 psi inlet pressure.

N O T E !

The maximum gas flow is 15Nl/min.



14

SWITCH OFF

N O T E !

The place of installation of the air conditioning unit must be
remain free from frost also during time when the unit is switched
off !


Switch off the device and disconnect the pressure air.
No more particular measures are required for switch off.


15

MAINTENANCE

Before carrying out maintenance work, the system and process-specific safety measures must be
observed!

W A R N I N G !


The air conditioning is operated with max. 145 psi inlet pressure.

High voltage and high pressure. Disconnect the mains plug and
the pressure air inlet before opening the housing!