Wayne-Dalton 9100 User Manual
Page 24
Tools Needed:
24
Tools Needed:
Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your
local yellow pages/business listings or go to the Find a Dealer section online at www.wayne-dalton.com
Counter Installation
Install the right side counter gear, with
the missing tooth toward the outside
and away from the end bracket. Press
the counter gear onto the end bracket
until snaps engage.
Select the right hand counter cover and
align the hex of the counter cam with
the end of the winding shaft. Also, align
the “0” on the counter cover with the
raised rib on the end bracket. Press the
counter cover against the counter gear
until it locks into place.
Repeat for left hand side for double
spring applications.
NOTE: No 36 tooth worm gear, counter
gear or counter cover is required on left
hand side for single spring applications.
Only an end bracket is needed.
IMPORTANT: AT THIS TIME DO NOT
WIND COUNTERBALANCE SPRINGS!
WINDING
SHAFT INSIDE
END BRACKET
MISSING
TOOTH
RAISED RIB
COUNTER
COVER
HEX OF THE
COUNTER CAM
COUNTER
GEAR
None
23
“0”
24
CENTER
BRACKET
BUSHING
ASSEMBLY
(2) 5/16” X 1-5/8”
HEX HEAD LAG
SCREWS
NOTE: If you are installing the idrive
®
opener on your garage door, skip this step
and continue with Step 25.
NOTE: If you are not installing the
idrive
®
opener on your garage door, you
must install the center bracket bushing
assembly. Follow these instructions for
non-idrive
®
operated garage doors.
NOTE: If you are installing a DoorMaster
™
opener, see optional DoorMaster
™
Bracket
installations on page 32, Figure B.
To locate the center bracket, mark the
header halfway between the fl agangles
and level the TorqueMaster
®
spring tube.
Drill 1/8” pilot holes into header for the
lag screws. Fasten the metal bracket to
the header using (2) 5/16” X 1-5/8” lag
screws.
NOTE: Upon completion of this step, con-
tinue with Step 29.
Securing Center Bracket
Assembly