Package Contents

2-1

Chapter 2
Installation and Setup

This chapter explains how to configure and install RIC-E1.
After the installation is complete, refer to

Chapter 3

for information about

operating RIC-E1.
Refer to

Chapter 4

for troubleshooting and diagnostics information.

2.1 Site Requirements and Prerequisites

AC-powered RIC-E1 units should be installed within 1.5m (5 ft) of an
easily-accessible grounded AC outlet capable of furnishing the required supply
voltage, in the range of 100 to 240 VAC.
DC-powered RIC-E1 units require a -48 or 24 VDC power source, which must be
adequately isolated from the mains supply. In order to prevent a fire hazard, a
suitable fuse must be installed in the live DC line.
Allow at least 90 cm (36 in) of frontal clearance for operator access and at least
10 cm (4 in) clearance at the rear of the unit for interface cable connections.
The ambient operating temperature of RIC-E1 should be 0 to 50°C (32 to 122°F),
at a relative humidity of up to 90%, non-condensing.

2.2 Package Contents

The RIC-E1 package includes the following items:
• RIC-E1 unit
• The AC power cord or DC power supply connector kit
• Ethernet over SDH/SONET and Converters CD
• Jumper plug for JP9 jumper
• CBL-530/449 adapter cable for units ordered with V.36 interface
• RM-29 rack installation kit (if ordered).

Order from: Cutter Networks