beautypg.com

Perform the auxiliary, Transformer #1 secondary and wiring harness test, Troubleshooting & repair – Lincoln Electric INVERTEC POWER WAVE 450 SVM112-B User Manual

Page 99: Warning

background image

POWER WAVE 450

AUXILIARY TRANSFORMER #1 SECONDARY

AND WIRING HARNESS TEST

Service and repair should be performed by only Lincoln Electric factory trained personnel.
Unauthorized repairs performed on this equipment may result in danger to the technician or
machine operator and will invalidate your factory warranty. For your safety and to avoid elec-
trical shock, please observe all safety notes and precautions detailed throughout this manual.

If for any reason you do not understand the test procedures or are unable to perform the
test/repairs safely, contact the Lincoln Electric Service Department for electrical trou-
bleshooting assistance before you proceed. Call 1-800-833-9353 (WELD).

TEST DESCRIPTION

This test will determine if there are any short circuits or other problems in the load circuits
fed by the secondary windings of the auxiliary transformer, which would cause the trans-
former to overheat or the fuse (F1 - primary side) on the reconnect panel to blow.

MATERIALS NEEDED

Volt/Ohmmeter (Multimeter)
5/16" Nut driver
3/8" Nut driver
Auxiliary Transformer #1 Secondary Circuit Wiring Diagram – Figure F.12

WARNING

TROUBLESHOOTING & REPAIR

F-39

F-39

Retur

n to Section TOC

Retur

n to Section TOC

Retur

n to Section TOC

Retur

n to Section TOC

Retur

n to Master TOC

Retur

n to Master TOC

Retur

n to Master TOC

Retur

n to Master TOC

This procedure takes approximately 30 minutes to perform.