beautypg.com

Gateway Server E-9520T User Manual

Page 56

background image

CHAPTER 4: Installing Components

www.gateway.com

50

5

Disconnect the main power, CPU power, backplane power, I

2

C power, and

midplane power cables. See

“System board” on page 5

for the location of

the connectors on the system board.

6

Loosen the thumbscrew (1) holding the power distribution board in place,
then slide the power distribution board (2) away from the side of the
chassis to release it.

7

Lift the power distribution board (3) out of the chassis.

Important

Make sure that the power supply cable

box is connected to the power supply

connector(s) on the power supply(ies).

8

Align the new power distribution board with the power supply cage and
the standoffs, then push it down onto the standoffs.

9

Slide the power distribution board toward the side of the chassis, then
tighten the thumbscrew to secure it to the chassis.

10

Reconnect the power cables. See

“System board” on page 5

for the

location of the connectors on the system board.

11

Set the case upright, if required.

12

Reinstall the power supply modules by following the instructions in

“Replacing a power supply module and power board” on page 48

.

13

Follow the instructions in

“Closing the server case” on page 30

.