beautypg.com

Final assembly, Final assembly -8 – HP 0706124 REV B User Manual

Page 20

background image

1-8

Unpacking and Assembly

Final Assembly

1.

Remove the two red-headed bolts from the right-hand ship-
ping support.

2.

Locate the assembly supports

.

The assembly supports are mirror images of each other; the
foam pad should be positioned toward the ends of the
printer.

3.

Align the assembly supports



with the shipping supports



, at the rear of the pallet as shown.

Fig. 1-2. Remove the red-headed bolts

Fig. 1-3. Assembly supports



, shipping supports









