Example installation diagrams – MCZ Athos HYDRO 14 kW User Manual
Page 29
![background image](https://www.manualsdir.com/files/856918/content/doc029.png)
PELLET STOVES
Chapter 3
INSTALLATION AND USE MANUAL
page
29
Installation and assembly
Technical service - Rights reserved MCZ S.p.A. - Reproduction prohibited
•
Hardness of water circulating in the system, to prevent
problems of incrustation and limescale, especially in the
domestic water heat exchanger. (> 25° French)
•
Installation of a water softener (if water hardness
exceeds 25° French)
•
Filling the system with treated water (demineralised).
•
Possibly providing an anti-condensation circuit.
•
Installation of plumbing bumpers to prevent banging
along the fittings and pipes.
If you have very extensive systems, with a large amount of water, or
which require frequent refilling, the installation of water softening
systems.
It should be remembered that incrustations
drastically reduce performance due to low thermal
conductivity.
3.5. EXAMPLE INSTALLATION DIAGRAMS
The following diagrams are to be used only as a
guideline. For proper connection, always follow the
notes for the plumbing and heating installer. The
plumbing system must meet local, regional or
national requirements. Installation and verification
of operation is to be performed only by specialized,
authorized personnel.
MCZ will not be held liable for non-compliance with
the provisions listed above.