Kl h g – MCZ Athos HYDRO 14 kW User Manual
Page 24
PELLET STOVES
Chapter 3
INSTALLATION AND USE MANUAL
page
24
Installation and assembly
Technical service - Rights reserved MCZ S.p.A. - Reproduction prohibited
K
L
H
G
3.3. INSTALLATION OF CERAMIC CLADDING FOR
POLAR AND NOVA
3.3.1. Installation of upper panel
Remove the two pre-installed nuts in the upper part of the frame. Take
the upper panel, open the hinge and install it, using the two screws
welded onto the frame, which you freed when you removed the nuts.
Check the alignment of the panel and tighten the nuts
Figure 3
3.3.2. Installation of lower panel
Remove the two pre-installed nuts in the lower part of the frame
alongside the ash compartment door. Take the lower panel, open the
hinge and install it, using the two screws welded onto the frame, which
you freed when you removed the nuts. Check the alignment of the
panel and tighten the nuts.
Figure 4
3.3.3. Installation of side tiles
INSTALLATION OF THE TILES MUST ALWAYS START
FROM THE BOTTOM.
1. Turn the screw K so that the rod H comes into contact with the
structure.
Figure 5 - phase 1
2. Insert the tile first from the side of the rod H, and then insert
the opposite part in the housing in the fixed hooks G.
Figure 6 -
phase 1
3. Turn the tile towards the exterior of the stove so that the front
edge that remains free rests on the upright.
Figure 6 - phase 2
4. Repeat steps 1-2-3 for all the tiles of the side.
Figure 6 - phase 3
5. Turn the screw K so that the connected rod H pushes the tile
towards the upright. Use another wrench to tighten nut L to
permanently secure the system.
Figure 6 - phase 4
6. Repeat the operations described on the other side.
H
G
Legend for Figures 5 and 6
G - Rear fixed hooks
H - Front blocking rod
L - Blocking nut
K - Blocking screw
Figure 3 – Installation of upper front panel
Figure 4 – Installation of lower front panel
Figure 5 – Side view of the fastening system
of the lateral ceramics
Figure 6 – Top view of fastening system of
the lateral ceramics