beautypg.com

3 opening the magnetics cabinet, 3 "opening the magnetics cabinet – SMA SC 500U Installation User Manual

Page 62

background image

SMA Solar Technology AG

62

SC500U-IUS093411

Installation Guide

16. Verify the absence of voltage with respect to ground at the AC clamp with an appropriate

meter.
☑ If there is a voltage present, the installation must be checked.

17. Verify the absence of voltage with respect to ground at the DC clamp with an appropriate

meter.
☑ If there is a voltage present, the installation must be checked.

10.3 Opening the Magnetics Cabinet

18. Switch off the Sunny Central as described in section 10.1 "Opening the Control Cabinet"

(page 60).

19. Make sure that no voltage is present as described in section 10.2 "Opening the Interface

Cabinet" (page 61).

CAUTION

The DC fuses in the Interface Cabinet become hot during operation.
Danger of burn injury due to hot components.
When working on the Sunny Central wear protective gloves.

20. Remove the 8 screws from the front of the magnetics

cabinet with a torx screwdriver.

21. Remove the wall by pulling it forward.

CAUTION

The transformers in the magnetics cabinet become hot during operation.
Danger of burn injury due to hot components.

• When working on the Sunny Central wear protective gloves.

Stop S

tart