beautypg.com

SMA SC 500U Installation User Manual

Page 54

background image

SMA Solar Technology AG

54

SC500U-IUS093411

Installation Guide

☑ The AC cables are now connected.

13. Connect phase B to the terminal marked "B". Tighten

the screw terminal using an Allen key. The required
torque is 42 ft-lbs (57 Nm).

14. Connect phase C to the terminal marked "C". Tighten

the screw terminal using an Allen key. The required
torque is 42 ft-lbs (57 Nm).

15. For 480 Delta:277 WYE connect cable N to the

terminal marked "N" . Tighten the screw terminal
using an Allen key. The required torque is 42 ft-lbs
(57 Nm).
or

For 480 Delta do NOT connect a neutral cable. In
this case, rail N is not used.