beautypg.com

2 switching the sunny central on – SMA SC 500U Installation User Manual

Page 56

background image

SMA Solar Technology AG

56

SC500U-IUS093411

Installation Guide

15. Inspect the interior of the Control Cabinet and Interface Cabinet to insure that they are free of

any tools, foreign objects, water, debris or documents.

16. Ensure that the area around the Sunny Central is clear of any tools, foreign objects or debris.
17. Check the AC connection for a possible clockwise phase sequence. For this purpose, hold the

terminals of the phase sequence indicator onto the three phases of the AC connection in the
Sunny Central. The indicator shows you whether there is clockwise phase sequence.

9.2 Switching the Sunny Central On

DANGER

During operation, high voltages are present in the Sunny Central.
Death resulting from electric shock.

• Do not operate the Sunny Central with doors open.

Below, on the door of the Interface Cabinet there is a door
stay (A).

1. To unlock the door stay (A) push upwards.
2. Close the door of the Interface Cabinet.
3. Attach the plate to the Magnetics Cabinet and

tighten the screws.

4. Close the right door of the Control Cabinet.
5. Inside of the door is a handle. Pull the handle

downwards to lock the door.

6. Turn on the automatic circuit-breaker on the inside of

the Control Cabinet’s door.

7. Shut the Control Cabinet door immediately.

8. Push the handle down toward the Sunny Central.

– When the handle has been pushed down, the

Sunny Central is closed.

A

Stop S

tart

Stop S

tart