beautypg.com

Verifying the installation – H3C Technologies H3C SecPath F1000-E User Manual

Page 33

background image

25

Figure 30 Connecting an AC power cord to the firewall

Verifying the installation

To ensure normal operation of the firewall, verify the following items before you power on the firewall:

There is enough space for heat dissipation around the firewall.

The grounding cable is securely connected.

The correct power source is used.