Rack installation, Power supply, Installation tools – H3C Technologies H3C SecPath F1000-E User Manual
Page 19: Accessories
11
Rack installation
•
Reserve at least 1 m (3.28 ft) of clearance between the rack and walls or other devices.
•
The equipment room is at least 3 m (9.84 ft) high and an air conditioner is installed.
Power supply
Make sure the power source of the installation site is steady and can satisfy the input requirements of
the power modules and parameters such as rated voltage. For the power module specifications, see
"
Appendix A Technical specifications
."
Installation tools
The tools in the table may be used for installing the firewall.
Flat-blade
screwdriver
Phillips screwdriver Needle-nose pliers
Wire-stripping
pliers
Diagonal pliers
RJ-45 crimping
pliers
Marker Multimeter
Network cable
tester
Hot air blowing
gun
Accessories
Console cable (supplied
with firewall)
Grounding cable
(supplied with firewall)
AC power cord (supplied
with firewall)
Mounting brackets
(supplied with F1000-E)
Mounting brackets
(supplied with
F1000-S-EI)
Rubber feet (supplied
with firewall)
Bail latch (supplied with
firewall)
M6 screw (user-supplied)