Rack installation, Power supply, Installation tools – H3C Technologies H3C SecPath F1000-E User Manual

Page 19: Accessories

background image

11

Rack installation

Reserve at least 1 m (3.28 ft) of clearance between the rack and walls or other devices.

The equipment room is at least 3 m (9.84 ft) high and an air conditioner is installed.

Power supply

Make sure the power source of the installation site is steady and can satisfy the input requirements of

the power modules and parameters such as rated voltage. For the power module specifications, see

"

Appendix A Technical specifications

."

Installation tools

The tools in the table may be used for installing the firewall.

Flat-blade
screwdriver

Phillips screwdriver Needle-nose pliers

Wire-stripping
pliers

Diagonal pliers

RJ-45 crimping
pliers

Marker Multimeter

Network cable
tester

Hot air blowing
gun

Accessories

Console cable (supplied
with firewall)

Grounding cable
(supplied with firewall)

AC power cord (supplied
with firewall)

Mounting brackets
(supplied with F1000-E)

Mounting brackets
(supplied with

F1000-S-EI)

Rubber feet (supplied
with firewall)

Bail latch (supplied with
firewall)

M6 screw (user-supplied)