beautypg.com

Scotsman Prodigy Plus D Series Service Manual User Manual

Page 16

background image

N0422, F0522, N0622, F0822, N0922, F1222, N1322, F1522
Air, Water or Remote Service Manual

December 2014

Page 16

Precharged Line Routing - Remote Only

Do not connect the precharged tubing until all routing

and forming of the tubing is complete. See the

Coupling Instructions for final connections.

1. Each set of pre-charged tubing lines contains

a 3/8” diameter liquid line, and a 1/2” diameter

discharge line. Both ends of each line have quick

connect couplings.

Note: The openings in the building ceiling or wall,

listed in the next step, are the minimum sizes

recommended for passing the refrigerant lines

through.

2. Have the roofing contractor cut a minimum hole

for the refrigerant lines of 2”. Check local codes,

a separate hole may be required for the electrical

power supply to the condenser.

Caution: Do NOT kink the refrigerant tubing while

routing it.

3. Route the refrigerant tubes thru the roof opening.

Follow straight line routing whenever possible.

4. Excess tubing may EITHER be coiled up INSIDE

the building OR cut out prior to connection to the

ice maker and condenser.

If the excess tubing is cut out, after re-brazing the

tubing must be evacuated prior to connection to the

ice maker or condenser.

If the excess tubing is to be coiled, spiral it

horizontally to avoid excess trapping in the lines.

5. Have the roofing contractor seal the holes in the

roof per local codes

To Remote

Condenser

Fan Motor

Power Supply to Condenser

Pre-Charged Tubing Line Set

Potable Water

Supply

Condensate Drain

This manual is related to the following products: