41 | Start Up
SETC/P Pre-Start Up Checklist
Unit Serial #: _________________ Tag: _______________
Unit type: _______ __________
Voltage: ________V/_____ph Steam output: ______lb/hr
Customer/Job:
Address:
Water Quality:
Potable (0-12 grains/gal, 0-14 ppm Silica, 0-25 ppm Chlorides) RO DI
Humidifier Mounting: (Clearances around the unit Acceptable Obstruction)
Level Front/Side Clearance
Anchored (if on stand)
Steam Line(s):
Slope up (min 2 in/ft).
Slope down (min 0.500 in/ft)
Diameter / Size
Material
Low point condensate traps
No Hose Kinks / Restrictions
Insulated
Type of Insulation
Condensate Line(s):
P Trap min 8 in. (20 cm) plus duct static pressure P Trap min 12 in drop
Water Line:
Can provide required flow
Water pressure: 30-80 psig
Drain Line:
Air gap within 3 ft of the unit
Diameter / Size
Auxiliary drain connected with shut off valve
Boiler Steam
Boiler Pressure
psi
Pressure to humidifier
psi
15 psi relief valve if med/high press boiler
Actuator closes and opens CV valve fully
Design pressure at CV valve
Condensate return Gravity feed or pump
Wiring:
Wiring connections and connectors secured
yes
no
Controls:
Control Location
Control to Terminal 4
High Limit Location
High Limit to terminal 5
Power:
Voltage, amp, fuse per Spec Label:
yes
no
Disconnect switch located close to humidifier
yes
no
Inspected by:
Date of inspection: ______/_______/______
Company: