beautypg.com

41 setc/p pre-start up checklist, He setc/p pre-start up checklist, 41, and to t – Nortec SE Series User Manual

Page 44: Setc/p pre-start up checklist

background image

41 | Start Up

SETC/P Pre-Start Up Checklist

Unit Serial #: _________________ Tag: _______________
Unit type: _______ __________

Voltage: ________V/_____ph Steam output: ______lb/hr

Customer/Job:

Address:

Water Quality:

Potable (0-12 grains/gal, 0-14 ppm Silica, 0-25 ppm Chlorides)  RO  DI 

Humidifier Mounting: (Clearances around the unit Acceptable Obstruction)

Level  Front/Side Clearance 

Anchored (if on stand) 

Steam Line(s):

Slope up (min 2 in/ft). 

Slope down (min 0.500 in/ft) 

Diameter / Size

Material

Low point condensate traps 

No Hose Kinks / Restrictions 

Insulated 

Type of Insulation

Condensate Line(s):

P Trap min 8 in. (20 cm) plus duct static pressure  P Trap min 12 in drop 

Water Line:

Can provide required flow 

Water pressure: 30-80 psig 

Drain Line:

Air gap within 3 ft of the unit 

Diameter / Size

Auxiliary drain connected with shut off valve 

Boiler Steam

Boiler Pressure

psi

Pressure to humidifier

psi

15 psi relief valve if med/high press boiler 

Actuator closes and opens CV valve fully 

Design pressure at CV valve 

Condensate return Gravity feed  or pump 

Wiring:

Wiring connections and connectors secured

yes 

no 

Controls:

Control Location

Control to Terminal 4 

High Limit Location

High Limit to terminal 5 

Power:

Voltage, amp, fuse per Spec Label:

yes 

no 

Disconnect switch located close to humidifier

yes 

no 


Inspected by:

Date of inspection: ______/_______/______


Company: