1 - Duct High Limit Installation

When installed as a high limit, the humidistat prevents over humidification as
well as wetting of the supply duct. Do not use fan relay when configuring as a
high limit.

Location:

1 Install directly on the supply duct in an area where the air is well mixed with

uniform flow.

2 Install downstream of the steam distributor at a distance 1.5 times the

absorption distance (typically 10-12 feet or 3-3.7 m). Must be in a location to
sense high humidity in addition to sensing when representative air is over
humidified or approaching saturation.

Installation:

1 Use the provided humidistat template and small level to mark outline of

humidistat body and location of probe hole. Ensure template is level before
marking.

2 Open the housing by removing the screw securing the face of the housing.
3 Drill a 5/8” (16 mm) hole in the duct at the marked location for probe

insertion.

4 Insert the probe into the air stream and place humidistat against duct wall.
5 Secure the duct humidistat to the duct using 4 sheet-metal screws (#6 x 3/4”

Phillips).

6 Wire as per wiring diagram 2548733 in this document.
7 Close the cover and secure using the screw removed in step 2.

Configuration:

1 Using keypad, set humidity to specified level (85% maximum) as a safety to

prevent saturation.

On/Off Digital Duct Humidistat Installation Instructions

This document covers the operation and installation instructions for the following digital humidistat:
Part #: 2548732

Description: On/Off Duct Humidistat

The humidistat can be configured for either humidity control or as a high limit safety device:


76 (3.0)

47 (1.9)

91 (3.6)

6

8

(2

.7

)

Humidify Relay

24 Vac

Com

Fan (Furnace)Relay

NTC Sensor

Figure 2: Dimensions

Figure 3: Terminal Strip

Figure 1: Duct Humidistat Installation Locations

2 - Humidity Control Installation

When configured as a humidity controller, the humidistat provides
accurate control of the RH in a return duct and will activate/deactivate
a furnace or circulation fan.

Location:

1 Install on the return air duct, close to the air inlet but upstream from

a return fan if one is present.

Installation:

1 Use the provided humidistat template and small level to mark outline

of humidistat body and location of probe hole. Ensure template is
level before marking.

2 Open the housing by removing the screw securing the face of the

housing.

3 Drill a 5/8” (16 mm) hole in the duct at the marked location for

probe insertion.

4 Insert the probe into the air stream and place humidistat against

duct wall.

5 Secure the duct humidistat to the duct using 4 sheet-metal screws

(#6 x 3/4” Phillips).

6 Wire as per wiring diagram 2548733 in this document. Figure 3

outlines the terminal layout.

7 Close the cover and secure using the screw removed in step 2.

Configuration:

1 Using keypad, set specified humidity level. For general health and

comfort, a humidity setting of 50% is recommended.

2 See Table 3 for outdoor temperature setback configuration, if

optional outdoor temperature sensor is supplied (P/N 2520263 or
2553858).

This manual is related to the following products: