beautypg.com

30 remote relay board wiring, Remote relay board wiring – Nortec SE Series User Manual

Page 33

background image

Installation | 30

Remote Relay Board Wiring

The SETC (not SEP) remote relay board provides the output signal for the CV Valve Actuator and
includes 4 relays that can provide remote status indication. The remote relay board is located
as shown in Figure 33: Remote Relay Board Wiring. The PCB with the relays includes markings
which indicate the function of each terminal on the board. The relays indicate the following
status;

1 Unit On – The normally open relay is closed when the humidifier has power and the On/Off

switch is set to on.

2 Steam – The normally open relay is closed when the control board sends a signal to the CV

valve actuator to open the CV valve and steam is being produced.

3 Service – The relay can be wired to open (NC) or close (NO) when a warning is displayed on

the humidifier display and the yellow service LED is illuminated.

4 Error – The relay can be wired to open (NC) or close (NO) when a fault is detected by the

humidifier controls.

























Figure 33: Remote Relay Board Wiring

S

te

a

m

U

n

it

O

N

E

rr

o

r

S

e

rv

ic

e

N

O

C

O

M

N

O

C

O

M

N

O

C

O

M

N

C

N

O

C

O

M

N

C