Rod rigging – Harken 7411.11 1/2 MKIV Jib Reefing & Furling User Manual
Page 28
ROD RIGGING
Insert two cotter pins and
spread. Clean excess Loctite
®
from terminal body using
special care to ensure that
there is no red Loctite
®
on
threaded stud.
Assembly
Rod Rigging: Rod Adapter Stud
Apply a few drops of red
Loctite
®
to threads of
nosepiece.
Screw main threaded stud
portion onto bronze nosepiece
until flats align with two cotter
pin holes in terminal body.
Tip: Turn nosepiece completely
into threaded stud portion.
Flats will be close and may
only require a small half turn
to align with cotter pin holes.
28
MKIV Underdeck Unit 1, 2, 3
This manual is related to the following products: