Unit 1 – Harken 7411.11 1/2 MKIV Jib Reefing & Furling User Manual
Page 21

Assembly
Top Foil
Cut out template at right. Line template up
with top of foil and scribed line. Tape in
place. Use a center punch to mark holes.
Check center punch marks to confirm
they from top of foil (see chart below).
Drill two (2) holes for trim cap. See chart
below for correct drill size
Lay top foil in line with others. Slide stay
into top foil and down line of foils or slide
each foil up stay.
Foil
To
p
!
1
3
/
8
" (35 mm)
3
/
8
" (10 mm)
3
/
16
" (5 mm)
1" (25 mm)
Foil
To
p
!
Unit 1
Foil
To
p
1
3
/
16
" (30 mm)
3
/
8
" (10 mm)
!
Unit 2
Unit 3 (3/4, 7/8)
Unit
Drill Ø
1
1/8" (3 mm)
2
5/32" (4 mm)
3 (3/4, 7/8)
5/32" (4 mm)
Unit
Center Punch Marks
1
3
/
16
" (5 mm)
1" (25 mm)
2
3
/
8
" (10 mm)
1
3
/
16
" (30 mm)
3 (3/4, 7/8)
3
/
8
" (10 mm)
1
3
/
8
" (35 mm)
MKIV Underdeck Unit 1, 2, 3
21
This manual is related to the following products: