Harken 7411.11 1/2 MKIV Jib Reefing & Furling User Manual
Page 11

Assembly
Assemble Drum Components
Place halves of plastic flange in
lower groove on hub assembly
so smooth side of flange is up.
Tip: Line up flats in flange with
flats in groove.
Place halves of plastic cover in
grooves so flats in cover align
with flats in groove.
Tip: Rotate each screw hole
towards the stern.
Use blue Loctite
®
on flathead
screws (provided).
Use blue Loctite
®
on flathead
screws (provided).
Assemble line guard so enclosed
opening faces lead block. Do not
use Loctite
®
on threads.
Tip: Loosely thread both screws
turning guard so it can be rotated
to its final position. Finish
tightening final screw when
enclosed opening faces lead
block.
Tighten screws using hex key
(provided).
Tighten screws using hex key
(provided).
MKIV Underdeck Unit 1, 2, 3
11