Grip Factory Munich GF-Primo User Manual
Page 8

GF-Primo / GF-Secondo Dolly System Instruction Manual
Page: 7
Attention:
When using the platforms ensure that they are mounted and fitted
correctly. The platform must fit snuggly to the dolly frame with no gap
inbetween. Ensure that the steel pin on the locking handle is engaged
correctly as described above i.e. the steel pin must be visible!
Mounting the Low Platform System
By using seat arm
extensions
the
standard platforms can
also be combined to
form steps and low
platforms.
Special “drop in” pins
are required. The pins
are inserted from top
to bottom and securely
bolted on the bottom
joint.
Attach
the
required
number of platforms. To
secure them, press the
stainless steel button and
push the handle towards
the dolly. When the handle
is engaged in the locked
position you will hear an
audible
click
and the
button will be extended i.e.
not flush with arm.
The 2 part Multifunctional Hi/low
Platform can be dismantled by
unscrewing 2 bolts, allowing the
wider platform part to be mounted on
the base dolly as described on the
previous page
Remove the 2
locking bolts to
dismantle
the
platform