2-10.5. Post-Installation Checks

Perform this inspection before power is connected. Conduct at least the following checks:

a. Check that the OrPT is securely placed in its socket in the pedestal.

b. Check proper mechanical installation of the OrPT.

c. Check that cables to the OrPT are secured and concealed. Fasten connections if necessary.

d. Check that cables to the OrPT run away from any moving parts.

Only after all the checks above are successful, connect power to the unit, and proceed with setup of
the unit (in the next chapter).