Gasboy FuelOmat Payment Terminal User Manual
Page 28

OrPT
Manual
18
2-10.2. Installation Requirements
z
Install the OrPT at the non-hazardous area.
When the OrPT is installed in Islander Plus pedestal, it is inherently considered a non-
hazardous area if the Islander Plus had been installed according to safety requirements (refer
to Gasboy's Document No. MDE - 4811)
z
Installation must be conducted by a technician authorized to work in a flammable gas
station environment in accordance with the local requirements and regulations.
z
Certify that the required installation preparations have been made:
-
Power supply to the OrPT
-
Installation location
2-10.3. Installation Kit
The items in the installation kit for an OrPT are listed in Table 2-5.
Table 2-5. OrPT Installation Kit
P/N Description Function
Qty.
814942700 CLAMP
HOUSING,
OrPT
PANEL
Mounting
1
815200104
SCREW WING M4x10, BOSSARD
Mounting
2
2-10.4. Installation Procedure
The OrPT is provided with its holder attached to it.
Perform the following procedure to install the OrPT unit onto the Islander Plus:
a. Disconnect all power sources in installation area, including power source to Gasboy
pedestal.
W
W
A
A
R
R
N
N
I
I
N
N
G
G
Conform to all safety regulations regarding working
in gas stations.
b. The OrPT is fed by 24Vdc. Use a stabilized power directly from the Orpak pedestal.
c. Connect all cable plugs to their mating connectors on the OrPT connectors panel, in
accordance with paragraph 2-5 on page 12.