5 : performing functional tests, Step, Powering the power supply on/off – AMETEK XG Family Programmable DC User Manual
Page 40

Installation
2-10
M370430-01 Rev E
Step
5: Performing Functional Tests
The functional test procedures include:
•
Power-on and front panel functional checks
•
Voltage mode operation and current mode operation checks.
For information on local operation, see “Local Operation” on page 3-1
for adjusting front panel controls and settings.
Powering the Power Supply On/Off
To power on the power supply:
1.
Ensure that the front panel power switch is in the Off position.
2.
Ensure that the AC line voltage is within operating range.
3.
Connect the line cord to a grounded AC outlet.
4.
Turn the front panel power switch to the On position.
After a short power-on delay,
illuminates on the
output voltage and current displays, followed by
.
After approximately 1 second, the display returns to normal status.
To power off the power supply:
Turn the front panel power switch to the Off position.
will blink on the display. The ALARM LED illuminates.
After a short delay, all lights on the display will not be illuminated.