Non-isolated current monitoring calibration – AMETEK XG Family Programmable DC User Manual
Page 275
Calibration and
Troubleshooting
M370430-01 Rev E
7-11
7
Non-isolated Current Monitoring Calibration
Important:
For maximum accuracy at a specific APG level, follow the
calibration procedure again but use the intended operating voltage level in steps
3 and 9.
To calibrate the non-isolated current monitoring:
1.
Short the main output with a shunt. Connect a multimeter to
measure the voltage across the shunt.
2.
Connect the voltmeter to the non-isolated current monitoring
output lines (J1.12 - J1.7).
3.
Set the Current APG level to 4 V. Send the SCPI command:
SYST:COMM:APR:LEV:CURR 4
4.
Set the input source as Local.
5.
The SCPI command is:
SYST:REM:SOUR:CURR LOC
6.
Set the main output voltage to 100% by sending the command
SOUR: VOLT
control.
7.
Turn the main output On by pressing the OUTPUT ENABLE
Main button on the front panel or send the command:
:OUTP ON
The OUTPUT ENABLE Main button will illuminate.
8.
Enter interactive calibration mode by sending SCPI
command:
CAL:MON:CURR
9.
Press on the terminal keys - or + to reduce or increase the
monitoring value. Adjust the monitoring value displayed on
the voltmeter that was set up in Step 1 to read as close as
possible to 4.000 V.
10.
Press any key other than the + or - keys to exit from
interactive calibration mode.