Maintenance Instructions

Safety Precautions

Before removing the valve from the line or loosening any bolts, it is
important to verify the following conditions:

1. Be sure the line is depressurized and drained.
2. Be sure of the pipeline media. Proper care should be taken for

protection against toxic and/or flammable fluids.

3. Never remove the valve without an Operator (Manual or Automatic)

already attached to the valve shaft.

4. Never remove the Operator from the valve while the valve is in the

pipeline under pressure.

5. Always be sure that the disc is cracked approximately 5° off of the

closed position before removing the valve.

General Maintenance

The following periodic preventative maintenance practices are
recommended for all Butterfly Valves.

1. Operate the valve from full open to full closed to assure operability.
2. Check flange bolting, actuator mounts and hangers for

evidence of loosening and correct as needed.

3. Inspect the valve and surrounding area for previous or existing

leakage at flange faces or shaft connections.

4. Check piping and/or wiring to actuators and related

equipment for looseness and correct as needed.

Installation Recommendations

F6…HD(U), F7…HD(U) Series Butterfl y Valves

Valve Installation- Dead End Service

1. Follow previously described pre-installation and installation

procedures.

2. To achieve the full close-off pressure of the HD/HDU series, a

flange is required on the open or down stream side of the valve
(Fig. 9)

1

1

Fig. 9