7 all parts of the encapsulator b-395 pro, 8 final installation check, All parts of the encapsulator b-395 pro – BUCHI Encapsulator B-395 Pro User Manual
Page 36: Final installation check, 5 .8 final installation check

5 Putting into operation
36
B-395 Pro
Operation Manual, Version C
5 .7
All parts of the Encapsulator B-395 Pro
Figure 5-26: Picture of all parts of the Encapsulator B-395 Pro
5 .8
Final installation check
This check has to be carried out after every installation and prior to the first encapsulation process. All
connected supply media (e.g. mains voltage and gas pressure) must match the technical data of the
installed system or system set-up.
• Inspect all glass components for damage.
• Check all other electrical connections for proper connection, such as optional or external compo-
nents, e.g. magnetic stirrer, vibration unit, syringe pump cabling.