Section 2.1, Detailed operating controls – BendixKing SG 465 System EFS 40/50 User Manual
Page 67

EHSI Operation
2.1.1
Issued 8/10 SW 04/05/06/07/08/09/10/11/12/13/14/15/16
EHSI OPERATION
DETAILED OPERATING CONTROLS
All possible EFS 40/50 Interfac-
ing Equipment is described in the
Detailed Operating Controls sec-
tion of the EFS 40/50 Pilot
’
s
Guide, however, all may not be
active in a specific installation.
This section, EHSI Operation, will
describe the operation of both
the ED 461 control display unit,
C P 468 EHSI control panel and
the EHSI section of the CP 4 6 7
EHSI/EADI control panel. The
EADI operation of the CP 467 is
covered in section 2.2, EADI
Operation. The CP 466A/B radar
control panels are covered in
section 2.3, RADAR Operation.
Figure 2.1
ED 461 EHSI
Section 2.1mp 9/8/10 7:46 PM Page 2.1.1
This manual is related to the following products: