Installation guidelines
HIGHGATE
Thermostatic Control Valve Trim
INSTALLATION GUIDELINES
Page 1 of 3
6.6.2012
These guidelines have been prepared for the professional contractor to aid in the installation of:
HIGHGATE THERMOSTATIC CONTROL VALVE TRIM WITH METAL CROSS HANDLE (STYLE#
HGTH01) & PORCELAIN LEVER HANDLE (STYLE# HGTH10)
All dimensions are based on original specification and are subject to change and variation.
Please consult your Design Associate for current specifications.
Metal Cross Handle
Style No. HGTH01
White Porcelain Lever Handle
Style No. HGTH10
SPECIFICATIONS:
Control Valve Rough-in Depth Minimum: 3-1/4"
Control Valve Rough-in Depth Maximum: 4-1/4"
Hot Limit Safety Stop: On Thermostatic Valve
REQUIRED PLUMBING DETAILS:
Universal 1/2" Thermostatic Valve
STYLE # GUTH56R
CODE # GUSV56R
IMPORTANT:
¾
To ensure this product is installed properly, you
must read and follow these guidelines.
¾
The owner/user of this product must keep this
information for future reference.
¾
This product is intended to work with the
Waterworks Universal 1/2" Thermostatic Valve
(GUTH56R) which features anti-scald protection.
The risk of scalding exists until the installer has
properly calibrated/adjusted the temperature
setting and set the integrated high limit stop on the
valve prior to final trim installation.
¾
Be sure your installation conforms to federal state,
and local codes. In the State of Massachusetts, all
installations must comply with the rules and
regulations set forth within 248 CMR.
¾
This product must be installed by a professional
licensed contractor.
¾
Refer to the specifications and assembly drawings
attached. Product is sold partially assembled but
shown fully disassembled for illustrative and service
purposes only.
¾
Inspect this product to ensure you have all the parts
required for proper installation.
¾
This product must be on-site prior to rough-in which
allows the installer to visualize the installation.
¾
Use only a strap wrench or protected/smooth-jaw
wrench on any finished surface.
TEMPERATURE CALIBRATION:
¾
The risk of scalding exists until the installer has
properly calibrated/adjusted the temperature
setting prior to final trim installation.
1.
Remove the tile guard and threaded tube. Slide the
o-ring and limit stop up on the cartridge stem. DO
NOT REMOVE OF DAMAGE THE O-RING. See
Figure-01.
Figure - 01
Limit Stop
O-Ring
Limit Stop Pin
Clockwise - Cold
Counter Clockwise - Hot
2. Turn on the water supply and a wall valve to run
water through the thermostatic valve.
3. Slowly rotate the cartridge stem clockwise to attain
full cold then rotate it counter-clockwise to attain
full hot. Verify a full range of temperature exists.
NOTE: It is approximately 3/4 of a rotation from full
cold to full hot.
4. With the water running, rotate the cartridge stem to
the adjust the temperature to the maximum desired
bathing temperature, verified with a thermometer.