Installation guidelines – Waterworks Julia Thermostatic Control Valve Trim with White Porcelain Lever Handles User Manual
Page 2
Installation Guidelines
W A T E R W O R K S
Waterworks is a registered trademark of Waterworks Inc.
4. The bottom port of the valve body is plugged (12a),
but can be used to supply water to other shower
fittings.
5. Install the tile guard (8).
FLUSH OUT THE SYSTEM:
The supply lines must be flushed out to prevent
clogging of the filter screens. Failure to flush the lines
will permanently damage the cartridge and void the
warranty.
6. The valve body is shipped with the flush plate (11)
installed and without the cartridge installed and is
ready for flushing the lines.
7. Turn on the water supply to flush out the lines then
inspect all connections for leaks.
8. After the lines are flushed, turn off the water supply,
unthread the 2 cover screws (9), then remove the
flush plate.
9. Install the cartridge/cover plate (10) using the 2
cover screws and turn off the in-line service stops.
10. Install the tile guard (8).
ATTACH THE TRIM:
11. Use only a protected, smooth-jawed, or strap
wrench on any finished surface.
12. Unthread the trim nut (5) from the threaded
sleeve (7a) then thread this sleeve to the valve
cover plate (10).
13. Disassemble the index assembly (1-1d) as 1 unit
from the handle by lifting the ring (1) off of the
handle.
14. Remove the handle assembly and the cover (3b)
from the limit stop assembly (4-4e).
15. Slide the escutcheon plate (6-6b) over the sleeve
until the plate contacts the wall.
16. While holding the escutcheon plate against the
wall, mark the sleeve at a point 3/16" beyond where
it protrudes through the plate.
17. Remove the escutcheon plate, unthread the
sleeve, then cut the sleeve at the point marked in
Step16. Do NOT cut the end of the sleeve that
has the internal threads.
18. Re-attach the threaded sleeve and slide the trim
plate over it.
19. Thread the trim nut onto the threaded sleeve
which will hold the plate against the wall.
20.Fully insert the square tube (7) into the trim nut
then by feel, make sure it slides over the stem and
stops against the valve cover plate - see Figure 1.
When seated properly onto the stem, the square
tube will have rotational resistance.
21.Mark the square tube at the point where it passes
through the face of the trim nut.
22.Remove the square tube and cut it 1/8" behind the
mark made on the tube in Step 21.
23.After cutting, insert the square tube back into the
trim nut making sure it is slightly recessed into the
trim nut.
CALIBRATE THE TEMPERATURE -
MANDATORY
The risk of scalding exists until the installer has
properly calibrated the temperature setting.
24.Turn on a wall valve and insert a bladed screw
driver into the square tube (7).
25.Slowly rotate the square tube clockwise to attain
full cold then rotate it counterclockwise to attain
full hot. Note: it is approximately 2 full rotations
from full cold to full hot.
26.Rotate the square tube to adjust the temperature
to the desired bathing temperature and confirm
the setting with a thermometer. Turn off the
water and make sure not to change this
temperature setting.
27.Unthread the 3 mm set screws (4) from the limit
stop assembly (4b).
These guidelines have been prepared for the professional contractor to aid in the installation of:
JULIA THERMOSTATIC SHOWER VALVE TRIM WITH CROSS HANDLE (JUSV59-K)
& LEVER HANDLE (JUSV60-K, JUSV61-K, JUSV62-K) All dimensions are based on original
specification and are subject to change and variation. Please consult your Design Associate for current
specifications.
Julia Thermostatic Shower Valve Trim
10.06.06