P29-reglazing-procedure – Oldcastle BuildingEnvelope Reliance-HTC User Manual
Page 32

E.1 Reglazing must be done from the exterior. carefully remove face covers surrounding the lite of glass to be
deglazed. SEE FIGURE 27.
E.2 Remove vertical and horizontal pressure plates adjacent to lite that must be replaced. Temp surrounding
glass in place with WW−333 temporary glazing retainers. torque to 60 in−lbs. refer to step 3.6, page 10 for
instructions on locating retainers.
E.3 Remove lite of glass and existing gaskets from opening. Clean debris and sealant from aluminum framing
members and pressure plates.
E.4 Install new gaskets into framing and install new lite of glass. See glazing section of this manual for proper
procedure.
E.5 Reinstall pressure plates and seals per glazing section of this manual.
Non-metallic shim
Pry bar
FIGURE 27
Reglazing
REGLAZING PROCEDURES
R E L I A N C E − H T C I N S T A L L A T I O N M A N U A L
MAY 2013
29
Phone: 1-866-OLDCASTLE (653-2278)
Web Address: www.oldcastlebe.com