Carrier 040-420 User Manual
Page 46

The schedule function can be programmed for inactive,
single set point, or dual set point operation.
When schedule is configured for inactive, chilled water
pump relay remains energized continuously but is not used
since chiller is usually controlled by remote chilled water
pump interlock contacts.
When unit is configured for single set point operation,
chilled water pump relay is energized whenever chiller is in
occupied mode regardless of whether chiller is running. When
chiller is in unoccupied mode, chilled water pump relay is
not energized.
When unit is configured for dual set point, chilled water
pump relay is energized continuously, in both occupied and
unoccupied modes. Occupied mode places occupied chilled
water set point into effect; unoccupied mode places unoc-
cupied chilled water set point into effect.
The schedule consists of from one to 8 occupied time pe-
riods, set by the operator. These time periods can be flagged
to be in effect or not in effect on each day of the week. The
day begins at 00
and ends at 24.00. The machine is in
unoccupied mode unless a scheduled time period is in ef-
fect, If an occupied period is to extend past midnight, it
must be programmed in the following manner: occupied pe-
riod must end at
hours (midnight); a new occupied
period must be programmed to begin at
hours.
NOTE: This is true only if the occupied period starts at
(midnight). If the occupied period starts at a time
other than midnight, then the occupied period must end at
hours (midnight) and new occupied period must be
programmed to start at
in order for the chiller to stay
in the occupied mode past midnight.
The time schedule can be overridden to keep unit in oc-
cupied mode for one, 2, 3 or 4 hours on a one-time basis.
See Example 9.
All subfunctions of schedule function are password pro-
tected except the override subfunction,
.
word entry into subfunctions
through
is done through service function. See page 44, logging on/
logging off.
Figure 9 shows a schedule for an office building with the
chiller operating on a single set point schedule. The sched-
ule is based on building occupancy with a 3-hour off-peak
cool-down period from midnight to 3 a.m. following the
weekend shutdown. To learn how this sample schedule would
be programmed, see Example 9.
NOTE: This schedule was designed to illustrate the pro-
gramming of the schedule function and is not intended as a
recommended schedule for chiller operation.
Example 9
Using
the
Schedule Function
DISPLAY
O V R D 0
O V R D 3
O V R O 0
C L O C K 0
C L O C K 1
C L O C K 6 5
PERIOD 1
00.00
M O N N O
M O N Y E S
TUE YES
T U E N O
P E R I O D 2
occ 00 00
occ 7 00
00.00
18 00
M O N N O
MON YES
T U E N O
TUE YES
W E D Y E S
W E D N O
No schedule override
in effect
3 hours override in effect
Override cancelled
Schedule function is inactive
Schedule function is enabled
through local unit clock
Schedule function is enabled
throuah CCN clock 65
Define schedule period 1
Start of occupied time
For this example, first
period should stat-t here
so no entry
Start of unoccupied time
(end of period) For this
period 1 should
end at 3:00 a m.
Period 1 ends at 3:00 a m
Monday is now flagged no
for
1 To out
into’ effect on
Monday must be flagged
Monday is now fla
period to be in e
ged for
ect
For this example, period
is to be in effect on Monday
only All other days must
checked to be sure that thev
are flagged no. If any day
flagged yes, change to no
Tuesday is now flagged
no for period
Define schedule period 2
Start of occupied
will start
Start of unoccupied time
(end of period) For this
example, period 2 should
end at 18:00 (6:00 p m )
Period 2 ends at 18:OO
(6:00 p m )
Monday is now flagged no
for period 2 To put period 2
into effect on Monday,
Monday must be flagged yes
Monday is now flagged for
period 2 to be in effect
Tuesay is now flagged no
for period 2 To put period 2
into effect on Tuesday,
Tuesday must be flagged
Tuesday is now flagged for
period 2 to be in effect
For this example, period 2
is to be in effect only on
Monday and Tuesday
All other days must be
checked to be sure that
they are flagged no. If
a day is flagged yes,
change to no
Wednesday is now flagged
no for period 2
CCN
Carrier Comfort Network
Example 9 continued next page.
4 6