P O I N T NUMBER OF
FIRST

CHANNEL

LIMIT

C O D E 3 1 2

4

P W R

I

(ALARM

(MODE

RET

c

DO+

D

LEGEND

C O M M

Communications Bus

PWR

P o w e r

SW

Switch

N O T E : F o r s p e c i f i c c o n n e c t i o n p o i n t s ,
see Fig. 24 29.

Fig 6

4 IN/4 OUT Options Module Wiring for Reset, Demand Limit,

Dual Set Point

Table 11

Service Functions

To view and modify configurations, the password must

be entered under the log on subfunction.

I

K E Y F A D

F U N C T I O N

E N T R Y

DISPLAY

COMMENT

P A S S W O R D

Enter

Password/

Disable Password

LOGGED ON Logged On

NOTE: Configurations may be modified at this time. When
finished viewing and/or modifying configurations, log out
as follows:

L O G G E D O N

L O G O F F

LOG

V E R S I O N

x x x x x x x x

X

Disable Password
Protection

Logged Off/

Enable Password
Protection

Software
Information

Version No
of Software

Language Options

To use Demand Limit, first enable loadshed, then enter

demand limit set points. See Example 7A. Closing the first
stage demand limit contact puts unit on the first demand
limit level, that is, the unit does not exceed the percentage
of capacity entered as demand limit stage 1. Closing con-
tacts on second-stage demand limit relay prevents unit from
exceeding capacity entered as demand limit stage 2. The
demand limit stage that is set to the lowest demand takes
priority if both demand limit inputs are closed.

The demand limit function must be enabled in order to

function and may be turned off when its operation is not
desired. The demand limit relays can, in off condition, re-
main connected without affecting machine operation.

-Demand Limit, 4-20

Signal

The controls can also

accept a 4-20

signal for load shedding. Input for the

signal are terminals shown below:

Externally powered (loop isolator required)

Positive lead to

4 In/4 Out Module

Negative lead to

4 In/4 Out Module

Internally powered

Positive lead to

4 In/4 Out Module

Negative lead to

4 In/4 Out Module

See Field Wiring section on page 71 and Fig. 6.

At field configuration step, select 4-20

by

entering

q

when the LSTYP 0 display appears. See

Example 7B. Then enter set points as follows. In this ex-

ample, set points are coordinates of the demand limit curve
shown in Fig. 8.

42